On the 16 March 2016 the Bishop of Salisbury, Rt Revd Nicholas Holtham, took part in a debate to approve the Government’s draft Renewables Obligation Closure Etc. (Amendment) Order 2016. Baroness Featherstone also tabled a Motion to Regret the change. The draft instrument closes the renewables obligation from 1 April 2016 (12 months early) to solar PV generating stations at 5 megawatts and below. It applies both to new generating stations and to existing stations that wish to add additional capacity up to the 5 megawatts threshold. The Bishop’s speech is below and the vote on the Regret Motion can be seen here.
The Lord Bishop of Salisbury: My Lords, it is curious to rehearse the same arguments so soon after the recent debate on feed-in tariffs. It is very disappointing in the wake of the success in Paris of COP 21, and the enthusiasm engendered from that about a new level of ambition in response to human-caused climate change. I feel as though the Minister is in a position of defending the indefensible. The noble Baroness, Lady Byford, made a very good point about the place of subsidies and pump-priming. Therefore, it is disappointing that the Government are not working more effectively with the renewable energy sector to build on the considerable success of that industry.
Continue reading “Bishop of Salisbury urges a rethink on Government renewable energy proposals”
You must be logged in to post a comment.